Whanganui Guide: Preparing for Re-roofing

Organise access, household routines and site arrangements before the old roof comes off.

06 880 1066
Roofing inspiration for preparing for re-roofing

Let’s start with your property

Start with the right question.

Preparation is mainly about agreeing a workable site plan. Know where people and materials will move, how the home is protected and who to contact if the programme changes.

When preparing for re-roofing, review the replacement sequence so household preparations match the work being discussed.

A clear scope. The right questions.
A considered next step.

Your project, in a few details

Get a Free Estimate

Start with what you know. All fields are required.

Send your details to start a conversation about your roof.

01 /

Walk through the site plan

Agree scaffold positions, delivery access, waste storage and the route to the front door. Discuss garden beds, fragile paving, neighbouring boundaries and any structures below the eaves.

02 /

Plan for everyday life

Move vehicles from agreed work areas. Keep children and pets away from the site and discuss noise-sensitive work or meetings. Ask whether ceiling dust is likely and what indoor preparation is appropriate.

03 /

Identify connected systems

Tell the contractor about solar panels, aerials, flues, alarms and rainwater tanks. Their isolation, removal or reconnection may need another trade and should be in the programme.

04 /

Agree the weather plan

Ask how roof removal will be staged and how temporary protection is managed. Conditions can change both start dates and daily progress. Keep a clear contact route for updates.

05 /

Keep a handover folder

Collect the agreed scope, changes, photographs and care instructions. Check that any follow-up work is recorded before the job is treated as complete.

  • Product and colour details
  • Approved variations
  • Maintenance guidance
  • Written warranty terms, if offered

Keep the next step informed

A few final questions.

Explore roof replacement

General planning information. Product and site-specific requirements should be checked for the actual work.

Should I clear the whole garden?

Only move what is agreed in the site plan. Mark items that cannot be moved and discuss protection.

Can I go onto the scaffold?

Do not enter the work area or use access equipment without the site team’s permission and appropriate controls.

Where should I start when applying this guide to my property?

Agree scaffold positions, delivery access, waste storage and the route to the front door. Discuss garden beds, fragile paving, neighbouring boundaries and any structures below the eaves.

What details should I discuss with the contractor?

Move vehicles from agreed work areas. Keep children and pets away from the site and discuss noise-sensitive work or meetings. Ask whether ceiling dust is likely and what indoor preparation is appropriate.

What else should I consider before deciding on the work?

Tell the contractor about solar panels, aerials, flues, alarms and rainwater tanks. Their isolation, removal or reconnection may need another trade and should be in the programme.

What should I include in my project checklist?

Collect the agreed scope, changes, photographs and care instructions. Check that any follow-up work is recorded before the job is treated as complete. Product and colour details Approved variations Maintenance guidance Written warranty terms, if offered